Job Site Safety Checklist for General Contractors
Last updated May 24, 2026
Job Site Safety Checklist for General Contractors
You are responsible for the safety of every person on your site, including subcontractors. This checklist covers the essentials.
Pre-Project Setup
- Post emergency contact numbers and nearest hospital address at the site entrance
- Identify utility lines (call 811 at least 3 business days before digging)
- Set up portable toilets and hand-washing station
- Mark pedestrian and vehicle entry/exit routes
- Brief all subs on site rules and emergency procedures on Day 1
Daily Pre-Work Walkthrough
Run this check every morning before crews start:
- No standing water or ice near work areas
- Scaffolding cross-braced and fully planked (no gaps)
- Extension cords are 12 AWG or heavier; no splices with tape
- GFCI protection on all exterior and wet-location receptacles
- Portable fire extinguisher accessible (not buried behind materials)
- First aid kit stocked and accessible
- Ladders are on solid, level footing and tied off at the top
Fall Protection (OSHA 1926.502)
- Any work at 6 feet or more above the next lower level requires guardrails, safety nets, or personal fall arrest
- Floor openings covered and marked (minimum 1-inch plywood, stenciled "OPENING -- DO NOT REMOVE")
- Leading edges guarded or workers in harnesses
- Ladder side rails extend 3 feet above the landing
Electrical Safety
- GFCI on every circuit in bathrooms, kitchens, garages, exterior, and within 6 feet of any water source
- Temporary power panels locked when unattended
- No aluminum extension cords on the jobsite (aluminum corrodes and arcs at connections)
- Minimum 10 feet of clearance from power lines for equipment
Trenching (OSHA 1926.651)
- Any trench 5 feet deep or more requires sloping, shoring, or a trench box
- Spoil piles kept at least 2 feet from the edge
- Egress every 25 feet in trenches 4 feet or deeper
Tools and Equipment
- Power tools have guards in place; never remove a guard in the field
- Grinders have proper wheels for the material being cut
- Eye and hearing protection available and used in high-noise / high-chip areas
- Compressed air hoses free of kinks and rated for the operating pressure
Documentation
Keep on file for every project:
- OSHA 300 log (required for sites with more than one worker)
- Material Safety Data Sheets (MSDS/SDS) for all chemicals on site
- Sub-contractor proof of insurance and licenses
OSHA penalty note: First-time serious violations start at $16,131 per incident (2024 figures). Willful or repeated violations: up to $161,323. Safety compliance is cheaper than the alternative.
Was this helpful?